exhibition stand GLASSTEC
We, the SPS team invites you kindly, to visit us at the GLASSTEC 2010 in Düsseldorf.

                                                                   28.09. - 01.10.2010, Halle 12 Stand 12D22
System solutions for the glass industry
Special highlights:
batch plant, batch charger, glass position detection, cullet return system, material balance-sheet, melting tank / furnace (oel, gas, O2, electro, mixed), power-regulation, electrode-cooling, energy distribution, reversal control, filter plant, feeder- / tube, riser, plunger, press- and blow machine control, burning-off- / edge-melting machine, annealing lehr, annealing lehr unloading, transfer portals sorting, BDE, OEE, quality management, alarm systems till to factory automation solutions based on SIMATIC PCS7
Weighing technique
Teleservice
previous page
SINUMERIK, SIMOTION, SINAMICS, Siemens technology CPU 317T with motion control function, SIMODRIVE, SIMOVERT, portal control
Drive engineering, machine controlling, portal control
Pictures -
glasstec 2008
next page
previous page
next page
SIWAREX-FTA,
SIWAREX-M,
SIWAREX-U
PCS7, visualization, formula management and batch storage, server / client structure, industrial fast ethernet, setup of redundant optical waveguide, statistical analysis, database integration
Siemens S7-300/400, upgrading existing Simatic S5-xxx to Simatic S7, upgrading existing TELEPERM M to SIMATIC PCS7, faceplate technology, migration PCS7 version X to 5/6, fuzzy control systems
modem, ISDN, internet, intranet WLAN, bluetooth, mobile
Process control system
Regulation and control systems
Automation- and process control technology for
exhibition stand GLASSTEC
NEWS
Schlemmer Prozess Systeme GmbH deutsch